Please, read the Participant Information Sheet and provide your explicit consent below before moving to the pilot participation and feedback provision.
The future estimates are based on averages of the past.
The extreme peaks of the past look not to be incorporated in the prognosis model.
A way to deal with this could be to create a new metric: (for instance:) the steepness and length of recorded past peaks; this could determine how prepared we should be for deviations.
The usability looks really great. Easy to use and access. Access with a click on a link, enticing dashboards with good visuals (statististics and topographic maps).
I see a lot of positive energy from the motivated participants.
I saw good cooperation between the different participating organisations with a good result. People were helping each other with presenting and answering questions.
I was happy to be a part of this.
Quite innovative
No such thing; there was an appropriate and friendly culture.
No
Still to discover:
authorization
authentication
definitions of private/public